Skip to main content
  • linkedin
  • English
  • Français
  • Wind turbine brochure and prices
Close Search
Enerlice
Menu
  • About us
  • Wind turbines
    • Small wind turbines 1 to 10 kW
    • SCIROCCO S15 and S15X wind turbines
    • 10 to 100 kW wind turbines
    • Vertical-axis wind turbines
  • Offers and services
    • Service and maintenance
    • Hybrid power stations
  • Case studies
  • News
  • Contact
    News

    SERRE CHEVALIER: installation of a TUGE 10kW wind turbine on the Col du Prorel at 2400m

    1 min read

    Serre Chevalier on the road to self-consumption

    The first ski resort in the Southern Alps could also become a pioneer in renewable energy. Since 2016, Serre Chevalier has been undertaking a major project aimed at enabling it to produce and consume its own electricity.

    Read the full article on Le Parisien
    > http://www.leparisien.fr/environnement/transition-connectee/serre-chevalier-en-route-vers-l-autoconsommation-26-11-2018-7953579.php

    Next Post

    Eiffel Tower maintenance of the 2nd floor wind turbines

    Eiffel Tower maintenance of the 2nd floor wind turbines

    Related Posts

    News Energy and Renewable Energy Study for the Autonomous Port

    Energy and Renewable Energy Study for the Autonomous Port

    October 2025: Autonomous ports face increasing energy needs
    f v
    f v9 October 2025
    News The new SCIROCCO S15 wind turbines

    The new SCIROCCO S15 wind turbines

    May 2025: ENERLICE is pleased to exclusively present the brand new SCIROCCO S15 wind turbine
    f v
    f v14 May 2025
    News A first 10kW wind turbine in the heart of the salt flats

    A first 10kW wind turbine in the heart of the salt flats

    September 2024: Salins du Midi, southern region
    f v
    f v24 September 2024

    Devis / contact

      You are:

      > Download our brochure here

      Have you downloaded our brochure above, which includes pricing information?

      ENERLICE specializes in commercial wind power; we can handle individual projects under the following conditions:
      - Self-consumption only
      - The wind resource must be assessed by an independent consultancy; otherwise, ENERLICE cannot make any production commitments
      - A strong commitment to eco-responsibility

      Please describe your project as precisely as possible, referring to our brochure for guidance.

      Accept By submitting this form, I agree to the information entered being used to contact me (Personal Data Management and Protection Policy)

      Contact us for more information...

      Contact
      FRANCE

      Parc d’activité du Grand Girac
      Krysalide – 70 rue Jean Doucet
      16470 Saint-Michel

      +33 (0)5 45 25 50 25

      Enerlice 2026 © Wind Turbine Specialists | Privacy Policy – Legal Notice

      Share
      Share Share Share Pin
      Close Menu
      • About us
      • Wind turbines
        • Small wind turbines 1 to 10 kW
        • SCIROCCO S15 and S15X wind turbines
        • 10 to 100 kW wind turbines
        • Vertical-axis wind turbines
      • Offers and services
        • Service and maintenance
        • Hybrid power stations
      • Case studies
      • News
      • Contact
      • English
      • Français
      • Wind turbine brochure and prices
      • linkedin